Lake Havasu 24-Month Study Forecast

Compare two-year Lake Havasu elevation, Parker Dam release, and hydropower scenarios.

July 2026 24-Month Study

Projected hydropower

Open current energy data

Month-by-month Parker Dam generation scenarios, measured in megawatt-hours.

End-of-horizon scenario values

This is the latest stored endpoint for each metric. It does not change when you choose another chart publication.

Lake Havasu and Parker Dam July 2026 24-Month Study endpoint values
Metric Horizon month Minimum Probable Most Probable Maximum Probable
Reservoir elevation 447.50 ft 447.50 ft
Dam releases 8,252 cfs 8,252 cfs
Hydropower generation 34,168 MWh 34,168 MWh

Reading the scenarios

Minimum Probable is the lower published planning path.

Most Probable is a planning trace, not a guarantee.

Maximum Probable appears when the publication includes it.

Scenario spread shows planning conditions, not odds for each line.

Lake Havasu reviews

Published reviews explain the studies shown above.

No Lake Havasu review has been published yet

New reviews appear when they are published.

Sources, dates, and limitations

Charts use the selected 24-Month Study for Lake Havasu and Parker Dam. Published scenarios are planning information, not guarantees.