Projected elevation
Month-by-month Lake Havasu elevation scenarios, measured in feet.
Compare two-year Lake Havasu elevation, Parker Dam release, and hydropower scenarios.
Month-by-month Lake Havasu elevation scenarios, measured in feet.
Month-by-month Parker Dam average release scenarios, measured in cubic feet per second.
Month-by-month Parker Dam generation scenarios, measured in megawatt-hours.
This is the latest stored endpoint for each metric. It does not change when you choose another chart publication.
| Metric | Horizon month | Minimum Probable | Most Probable | Maximum Probable |
|---|---|---|---|---|
| Reservoir elevation | 447.50 ft | 447.50 ft | — | |
| Dam releases | 8,252 cfs | 8,252 cfs | — | |
| Hydropower generation | 34,168 MWh | 34,168 MWh | — |
Minimum Probable is the lower published planning path.
Most Probable is a planning trace, not a guarantee.
Maximum Probable appears when the publication includes it.
Scenario spread shows planning conditions, not odds for each line.
Published reviews explain the studies shown above.
New reviews appear when they are published.
Charts use the selected 24-Month Study for Lake Havasu and Parker Dam. Published scenarios are planning information, not guarantees.