Lake Mohave 24-Month Study Forecast

Compare two-year Lake Mohave elevation, Davis Dam release, and hydropower scenarios.

July 2026 24-Month Study

Projected hydropower

Open current energy data

Month-by-month Davis Dam generation scenarios, measured in megawatt-hours.

End-of-horizon scenario values

This is the latest stored endpoint for each metric. It does not change when you choose another chart publication.

Lake Mohave and Davis Dam July 2026 24-Month Study endpoint values
Metric Horizon month Minimum Probable Most Probable Maximum Probable
Reservoir elevation 640.00 ft 640.00 ft
Dam releases 10,707 cfs 10,688 cfs
Hydropower generation 79,703 MWh 79,566 MWh

Reading the scenarios

Minimum Probable is the lower published planning path.

Most Probable is a planning trace, not a guarantee.

Maximum Probable appears when the publication includes it.

Scenario spread shows planning conditions, not odds for each line.

Lake Mohave reviews

Published reviews explain the studies shown above.

No Lake Mohave review has been published yet

New reviews appear when they are published.

Sources, dates, and limitations

Charts use the selected 24-Month Study for Lake Mohave and Davis Dam. Published scenarios are planning information, not guarantees.